Intakt was started on 2026-10-24 for the Symfony AI & MCP Hackathon (deadline 2026-11-22). Most of it was built by the build loop that developed Intakt, an AI runner Intakt is designed to replace: sessions wrote the design and the plan, the loop built the issues, and a panel of AI reviewers approved or sent back every pull request. This page follows that path milestone by milestone: what was planned, what happened, what changed, and what we learned. The Symfony and Symfony AI features behind it are on Highlights.

At a glance

| | | |—|—| | First merged pull request | 2026-10-26 | | Pull requests merged | 1288 counted (to 2026-11-23) | | Issues closed | 1756 counted (1637 done, 119 dropped) | | Busiest day | 109 counted merges (2026-11-22) | | Tokens per merged pull request | 1.87M measured (2412M measured tokens over 1288 counted merges; not included: 25.61M estimated tokens reserved for killed steps) |

Counted: from the pull requests and issues the GitHub API lists. Measured: the providers’ usage answers, summed per day from the tokens field of docs/journey/usage.jsonl. Estimated: the reservations of steps that were killed before they reported usage, from the reserved field of docs/journey/usage.jsonl and never added to the measured tokens.

The token figures run to 2026-11-21, the last full day of the usage export; the merge counts run to the recording of 2026-11-22, so the figure per merge is slightly low.

Merged pull requests per day, counted from the GitHub API:

10-26  ▏ 2
10-27  ████ 16
10-28  ██████ 23
10-29  █████████████ 52
10-30  ██████ 22
10-31  █████████████ 51
11-01  ████████████ 48
11-02  ███████████ 42
11-03  ████████████ 49
11-04  █████████ 34
11-05  █████ 18
11-06  ████████ 32
11-07  ████████ 30
11-08  ██████ 23
11-09  ████ 17
11-10  ████████ 30
11-11  █████████ 34
11-12  ██████████████████ 73
11-13  █████ 18 (to 07:30)

Token usage

Tokens per day the loop spent on Intakt across every account: 2412M measured from 10-27 to 11-21, 2068M measured on Claude and 345M measured on GPT. Building took 66% measured, reviewing 34% measured (Claude 19.7%, GPT 14.3%). Tokens are counted the same way for both vendors: input and output in full, cached input at a tenth. Beside them, 25.61M estimated tokens were reserved for Claude steps that were killed before they reported usage; the charts leave them out.

Tokens per day by lane (measured)

Measured: the providers’ usage answers, summed per day from the tokens field of docs/journey/usage.jsonl.

Tokens per day by lane (measured), as a table
Day Claude, building (measured) Claude, reviewing (measured) GPT, reviewing (measured)
10-27 9,743,937 1,414,394 1,475,652
10-28 15,080,151 3,670,947 5,320,086
10-29 17,634,626 6,574,144 9,313,894
10-30 10,410,087 2,367,409 3,389,857
10-31 26,116,605 5,239,242 7,602,051
11-01 46,799,005 6,924,580 10,302,741
11-02 41,154,441 6,110,315 9,295,766
11-03 39,788,254 5,790,708 8,540,343
11-04 29,590,671 6,868,585 6,306,327
11-05 21,101,440 7,015,509 3,739,786
11-06 33,312,742 15,162,642 7,309,720
11-07 49,929,733 14,623,577 7,827,106
11-08 43,452,349 11,062,758 6,456,744
11-09 42,880,259 6,395,410 3,873,823
11-10 39,897,375 13,950,428 7,782,678
11-11 51,627,169 16,252,098 9,348,347
11-12 58,288,733 19,354,173 10,917,017
11-13 101,198,931 24,223,152 14,192,612
11-14 71,332,146 18,493,242 10,300,181
11-15 64,468,859 15,113,163 8,565,064
11-16 105,518,060 24,083,406 14,752,328
11-17 109,156,502 21,669,591 13,735,417
11-18 181,425,471 66,745,561 43,561,360
11-19 125,886,392 53,179,319 36,857,642
11-20 120,385,619 56,747,813 44,719,942
11-21 137,390,140 45,077,106 39,147,860

By account. Until 10-31 the loop ran on Claude account 1 alone; from 10-31 each job picks the account with the most room that would otherwise go unused, and from 11-04 an API key takes over only when the subscriptions are spent (120M measured tokens to 11-21: 30M measured on 11-06 to 11-08, 24M measured on 11-13 and 11-14, 65M measured on 11-18 and 11-19). GPT reviews every head from its own subscription.

Tokens per day by account (measured)

Measured: the providers’ usage answers, summed per day from the tokens field of docs/journey/usage.jsonl.

Tokens per day by account (measured), as a table
Day Claude account 1 (measured) Claude account 2 (measured) Claude API key (measured) GPT subscription (measured)
10-27 11,158,331 0 0 1,475,652
10-28 18,751,098 0 0 5,320,086
10-29 24,208,770 0 0 9,313,894
10-30 12,777,496 0 0 3,389,857
10-31 10,486,257 20,869,590 0 7,602,051
11-01 45,679,626 8,043,959 0 10,302,741
11-02 47,264,756 0 0 9,295,766
11-03 32,292,324 13,286,638 0 8,540,343
11-04 17,987,592 18,471,664 0 6,306,327
11-05 9,566,052 18,550,897 0 3,739,786
11-06 25,735,436 7,398,215 15,341,733 7,309,720
11-07 0 50,675,989 13,877,321 7,827,106
11-08 47,143,797 6,193,793 1,177,517 6,456,744
11-09 49,275,669 0 0 3,873,823
11-10 53,847,803 0 0 7,782,678
11-11 58,871,551 9,007,716 0 9,348,347
11-12 64,662,528 12,980,378 0 10,917,017
11-13 65,234,089 38,711,912 21,476,082 14,192,612
11-14 56,025,456 30,870,357 2,929,575 10,300,181
11-15 71,000,467 8,581,555 0 8,565,064
11-16 104,167,553 25,433,913 0 14,752,328
11-17 118,887,991 11,938,102 0 13,735,417
11-18 120,550,555 74,684,921 52,935,556 43,561,360
11-19 11,833,521 154,973,623 12,258,567 36,857,642
11-20 56,734,639 120,398,793 0 44,719,942
11-21 182,467,246 0 0 39,147,860

Tokens per merged pull request, per day:

Tokens per merged pull request (measured)

Measured: the day’s tokens from the providers’ usage answers, summed per day from the tokens field of docs/journey/usage.jsonl, divided by the pull requests merged that day, counted from the GitHub API.

Tokens per merged pull request (measured), as a table
Day Tokens per merge (measured)
10-27 789,623
10-28 1,046,573
10-29 644,666
10-30 734,879
10-31 763,880
11-01 1,333,881
11-02 1,346,679
11-03 1,104,475
11-04 1,257,811
11-05 1,769,818
11-06 1,743,284
11-07 2,412,680
11-08 2,650,950
11-09 3,126,440
11-10 2,054,349
11-11 2,271,400
11-12 1,213,149
11-13 2,737,543
11-14 1,925,491
11-15 1,958,824
11-16 2,328,287
11-17 2,258,773
11-18 3,646,654
11-19 4,233,791
11-20 2,919,123
11-21 2,735,988

Issues created and closed

In the snapshot of 2026-11-13, 1,055 counted issues were filed from 10-27 to 11-13 and 773 counted were closed (761 done, 12 dropped); the table below is read from the GitHub API when the page is built, so its counts for the same days differ. Most new issues come from the work itself: plan tasks split into parts, review follow-ups and design findings. Closing kept pace in the first days; from 10-31, when the switch plan added M6 to M8, more were filed than closed almost every day, and 11-12 was the first day since 10-30 that closed more than it filed.

Issues created and closed per day (counted)

Counted: from the issues the GitHub API lists.

Issues created and closed per day (counted), as a table
Day Created (counted) Closed (counted)
10-27 49 4
10-28 27 27
10-29 55 53
10-30 25 26
10-31 86 57
11-01 89 58
11-02 54 49
11-03 81 57
11-04 70 39
11-05 42 23
11-06 45 40
11-07 56 42
11-08 52 39
11-09 50 31
11-10 77 47
11-11 56 44
11-12 92 108
11-13 182 158
11-14 85 76
11-15 76 62
11-16 127 91
11-17 46 91
11-18 198 116
11-19 74 71
11-20 81 109
11-21 88 99
11-22 93 111
11-23 32 28

Open issues at the end of each day (11-22: at the time of the recording, not the end of the day):

Open issues per day (counted)

Counted: from the issues the GitHub API lists.

Open issues per day (counted), as a table
Day Open issues (counted)
10-27 45
10-28 45
10-29 47
10-30 46
10-31 75
11-01 106
11-02 111
11-03 135
11-04 166
11-05 185
11-06 190
11-07 204
11-08 217
11-09 236
11-10 266
11-11 278
11-12 262
11-13 286
11-14 295
11-15 309
11-16 345
11-17 300
11-18 382
11-19 385
11-20 357
11-21 346
11-22 328
11-23 332

Timeline

Timeline

Milestones

| Milestone | Goal | Due | Last issue closed | Done / open (counted) | |—|—|—|—|—| | M0 Unblock | Fixes the build loop needs before anything else | 10-27 | 11-05 | 7 / 0 | | M1 Review core | One reviewer returns a schema-valid verdict for a local branch, recorded in the ledger; Intakt boots and runs probes offline | 11-02 | 11-06 | 58 / 0 | | M2 Panel and rounds | A configured panel, quorum, persistent finding ids, the judge, a console command | 11-09 | 11-12 | 53 / 0 | | M3 Agents and memory | MCP server and client, the Store briefing, labels, GitHub, branch cleanup | 11-14 | 11-03 | 31 / 0 | | M4 Live dashboard | Rounds, streaming progress, verdicts and cost, live | 11-17 | 11-06 | 25 / 0 | | M5 Demo | Image in worker mode with no state leaks, docker compose up, sample repository, the five-minute path, hardening | 11-21 | open | 646 / 22 | | M6 Shadow | Plan T37 to T43 (#319 to #325) and their parts; readied early by the owner on 2026-11-01. | 11-24 | open | 217 / 2 | | M7 Builder half | Plan T44 to T69 (#326 to #351). | 12-14 | open | 363 / 126 | | M8 Switch | Plan T70 to T74 (#352 to #356). | 2027-01-07 | open | 49 / 15 | | After the hackathon | Planned, but not part of the hackathon release (2026-11-22). | none | open | 49 / 108 |

Counted: from the issues the GitHub API lists, by each issue’s milestone.

M3 and M4 finished eleven days early. M5 grew from 8 planned tasks to 292 counted issues: on 2026-11-03 every quality and robustness issue a demo visitor could hit moved into it.

M0 to M2: the review core (10-24 to 11-12)

Planned: one reviewer, then a panel with quorum and a judge. Happened: the design was written in two days and split into 31 plan tasks with acceptance criteria (#5 to #35). From there the loop built and reviewed each task. Decided on the way (10-26): PHP 8.5 and Symfony, MIT license, several projects per install, vendor accounts as a prioritized list, and Symfony AI 1.0 beta used to its limits, with bugs reported upstream.

M3 and M4: agents and a live dashboard (to 11-06)

Happened: MCP server and client, the Store briefing, GitHub integration and the live dashboard landed ahead of schedule. Learned: a stall needs a named cause. On 11-02 one pull request blocked the whole critical path for hours: the CI image lacked FrankenPHP, and the owner’s approval for a new package was only asked after CI went green, which it could not. Since then every stall gets a cause and a route, and owner decisions are asked on first sight (#595).

The plan changes (10-31 to 11-09)

M5: the demo (to 11-21)

Planned: container image, docker compose up, a sample repository, the five-minute path. Happened: the timed run from git clone to the first verdict is recorded at the deadline. Releases: v0.1.0 on 11-11, then a release train twice a day (13:00 and 21:00); a test instance follows each tag.

The week before the deadline:

M6 to M8: Intakt builds itself

M7 started before the deadline: 29 of its issues were done by 11-13. Its status at the deadline follows here.

Capacity: accounts, builders, reviewers and CI

The loop grew from one builder and one reviewer to five builders and three review workers in three weeks, each step measured first.

Date Change Why
10-24 Second build slot two issues build at once
10-31 A pool of AI subscriptions; each job picks the account with the most room that would otherwise go unused one account capped the whole loop
10-31 GPT reviews in Claude’s place while every Claude account is out, with a catch-up review later a review never waits for one vendor
11-02 Third build slot, first only on room that would expire at the weekly reset, always on from 11-03 about half an account-week went unused
11-03 GPT reviews every head, next to Claude every head gets a second vendor’s review, low-risk ones included
11-04 An API key as overflow after the subscriptions paid capacity only when the subscriptions are spent
11-12 Second review worker builders stood idle 158 times in one day waiting for review
11-13 Build slots 4 and 5 (subscriptions first, the API key as backup), a third review worker the API key had spent nothing in the week to 11-12 while 118 ready issues waited
11-13 CPU weights: reviews 400, slots 1 to 3 100, slots 4 and 5 25 extra builders use only idle CPU, reviews never wait behind tests

CI

Date Change Why
10-26 GitHub-hosted runners, pinned actions, Dependabot a gate on every pull request from day two
10-28 Persistence tests on MySQL, MariaDB and PostgreSQL the ledger must work on all three
10-29 CI code runs as an unprivileged user in a built image, without a Docker socket; database engines only when persistence changes untrusted pull request code, faster runs
10-30 Disposable self-hosted runners, the runner chosen by a repository variable Docker job containers that are thrown away after each job, and more minutes than a private repository’s free tier
11-02 FrankenPHP in the CI image the live dashboard’s tests could not run, which stalled the critical path
11-10 Ubicloud runners (4 vCPU) hosted machines, so the home server’s CPU stays with the build loop
11-12 Composer cache restored from the Actions cache 25 “withheld log” failures were empty-cache downloads, not tests
11-12 The head’s CI run is the build’s check three local check runs pushed the build container to load 27

Dashboard design

The dashboard was designed before most of it was built. 10-27: lessons from running several projects on shared accounts went into the design. 11-04: a Designer joined the team roles (UI only: checks, a scored rubric and a blind pairwise taste ladder calibrated by the owner’s votes). 11-05 and 11-06: a design system, a logo and mocks for every page. The board and the task detail page are built against the mocks for the demo; the remaining pages (projects, team, history, settings, setup) follow after the hackathon.

What we learned

How this page is made

#1740: bin/journey writes the regions between journey:begin and journey:end markers: the At a glance table, the milestone table and the charts with a table of their numbers, from the GitHub API (milestones, issues and pull requests, read when the page is built) and token use from docs/journey/usage.jsonl. It draws the charts and the timeline above as SVG files in docs/journey/. The numbers written by hand in the text are a snapshot of 2026-11-13, except the token figures, which follow docs/journey/usage.jsonl to 2026-11-21. docs/journey/usage.jsonl holds tokens per day, vendor, account and lane, nothing about limits; Claude and GPT are counted the same way (input and output in full, cached input at a tenth). A step that was killed (out of memory, a host restart) reports no usage and counts at its reservation: 25.61M tokens, about 1.1% beside the measured ones, are such reservations. The file keeps them in a reserved field apart from the measured tokens, the charts and the measured figures leave them out, and the At a glance table shows their total beside the measured one. The milestone stories and lessons are written by hand and link to the issue or pull request behind a claim where there is one.

Each figure is followed by its kind, as in Intakt’s review report: measured for tokens the providers’ usage answers reported, counted for merges, issues and rounds counted from the GitHub API or the build loop’s records, estimated for the tokens reserved for killed steps. The page shows no cost. Each table and chart names its kind in its column or title and says under it where its figures come from; a figure that divides measured tokens by counted merges shows both parts beside it, each with its own kind, and no total adds measured and estimated tokens.